Tuesday, August 12, 2008

Today was lumber day at work, this usually involves about 8 guys unloading a truck of 14/16 foot boards of Poplar, one board at a time down 2 window shoots. The new way is with 8 foot boards on pallets, unloaded with a pallet jack. However the shipment came with some pallets double stacked, so we had to break these down which took a little longer. The job did only use 5 guys and we learned some valuable lessons to how to do it better next time. This is the first time we have received a shipment this way.
The cat by the way seemed quite content to stay in the packing and shipping area all day.

No comments: